
4601 N. Fairfax Drive, Suite 1200
Arlington, VA 22203
©2022 Lean Construction Institute. All Rights Reserved. · Threshold Technologies, Inc.
This event will discuss the Last Planner System® in a Lean Coffee atmosphere. Several community members who are actively using LPS® in their projects will be in attendance. The purpose of a Lean Coffee is to learn and support each other in our Lean endeavors! Take part in an open conversation in a safe, small and low-pressure environment about the topics that are relevant to our Lean community. We want to hear about the problems you are solving, the issues you want to solve, and lessons you’ve learned on your Lean Journey. No previous Lean experience is required.
Participants from cross functional roles as designers, constructors, owners, trades partners, and associations propose discussion topics around any subject about which they want to learn – THERE ARE NO IRRELEVANT DISCUSSION TOPICS!
Each proposer takes 15 to 30 seconds to pitch their topic, written on a sticky note, to the group. Once all topics have been pitched, voting begins to establish a priority for discussing the topics. Topics are then ordered from highest to lowest votes and examined accordingly. Participants will receive 8 minutes of time to discuss the topic. After 8 minutes there will be a ‘thumbs up/ thumbs down’ to decide whether or not the discussion should continue. Thumbs up equals 4 more minutes on the clock. This happens until it is agreed that the topic has been discussed to satisfaction. Takeaways are considered and then the topic with the next largest amount of votes is addressed. Come as you are and be ready to learn!