
4601 N. Fairfax Drive, Suite 1200
Arlington, VA 22203
©2022 Lean Construction Institute. All Rights Reserved. · Threshold Technologies, Inc.
This topic introduces the Last Planner System® (LPS®) 5 levels and connected conversations.
Participants will learn the benefits and key concept of LPS, definition of Last Planner, push versus pull methodology. Learning will include examples of LPS being implemented.
The LCI Lean Learning Series is a facilitated discussion-oriented event focused on a specific Lean subject matter.The event is more structured than a Lean Coffee yet shorter and less structured than a LCI education course.Its purpose is to provide just enough knowledge base to kick start an engaging Lean discussion amongst the participants.
Facilitators: