The Lean Coach’s Perspective on Using Last Planner® in Design (Arizona CoP)

When:
July 25, 2019 @ 5:30 pm – 7:30 pm (under construction)
Where:
Tempe
Arizona
85281
Southland Industries Office
1500 N. Priest Suite 114
Contact:
LCI Arizona CoP

LCI Arizona Community of Practice

presents

The Lean Coaches’ Perspective on Using Last Planner® in Design


A 40-year industry veteran and 10-year veteran Lean coach and co-author from The ReAlignment Group of California tells stories of how the Last Planner® System (LPS) has been used effectively in Design on real construction projects in institutional/educational buildings, commercial and mixed-use housing. Dan also tells stories of how LPS has been misused in design. From real life examples with numerous photos, he draws several key lessons learned from over two dozen design project examples.

Speaker:

Dan Fauchier - The ReAlignment Group of California - Dan Fauchier is a Certified Master Facilitator for The ReAlignment Group of California with 10 years in Lean Design and Construction, facilitating, training and coaching over 150 companies and agencies in various principles, tools and techniques including Last Planner® System (pull planning) in design and construction.

Registration Rates:

Member Rate: $40

Non-Member Rate: $50

 Dinner will be served