
4601 N. Fairfax Drive, Suite 1200
Arlington, VA 22203
©2022 Lean Construction Institute. All Rights Reserved. · Threshold Technologies, Inc.
Unpredictable workflows correlate with an increase in construction costs and schedules. The Last Planner System® (LPS®) was developed to improve predictability while maximizing efficiency and safety. In the Introduction to The Last Planner System® webinar, you will discover the five connected planning conversations of LPS® and how they improve communication, trust, transparency and reliability. This webinar, which includes real-life examples of LPS® implementation will be a first step in mastering the System.
Learning Objectives: