
4601 N. Fairfax Drive, Suite 1200
Arlington, VA 22203
©2022 Lean Construction Institute. All Rights Reserved. · Threshold Technologies, Inc.
Welcome
LPS® 201 Field Lessons: How to implement/facilitate
Production Management: Batch size work flow–practical application
Managing Trades as Partners: IPD vs GMP
Productivity Tracking: Cost projection and team self-auditing, feedback Loop
Techniques for field collaboration coordination of designers and contractors: Techniques for Design-assist
4601 N. Fairfax Drive, Suite 1200
Arlington, VA 22203
©2022 Lean Construction Institute. All Rights Reserved. · Threshold Technologies, Inc.