A multi-party agreement that includes the owner, design professional, and constructor as signatories to the same construction contract.
A project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and optimize efficiency through all phases of the project, from early design through project handover. The three contractual components of IPD include Organization structure, Lean Operating Systems and Commercial Terms.