The individual engaged in a conversation for action who will receive the results of performance either requested from, or offered by, the Performer. Ie – the person receiving goods/information from a performer. Customers can be internal (a foreman receiving answer to an RFI, Architect receiving mechanical loads from engineer), and external (end users, client organizations, etc).
A set of organizing concepts that support Lean Project Delivery. They were developed to explain and organize the Sutter Health Lean Construction Initiative: Optimize the project not the piece, Collaborate, Really Collaborate (originally implied “specialty contractors involved at schematic design”), Projects as Networks of Commitment, Increase Relatedness, and Tightly Couple Action and Learning.
Movement that is smooth and uninterrupted, as in the “flow of work from one crew to the next” or the flow of value at the Pull of the customer.
The Japanese term for where value is added or where the work takes place. Lean experts encourage “going to the gemba” to see how things are really done and where there is opportunity to eliminate or reduce waste. H
A system for producing or delivering the right amount of parts or product at the time it is needed for production. (“JIT”) K
The Japanese word for continuous improvement. Kaizen has come to mean the philosophy of continuous improvement.
The instant in which the cost of the delay of a decision surpasses the benefit of delay; or the moment when failing to take a decision eliminates an important alternative.
Culture of respect and continuous improvement aimed at creating more value for the customer while identifying and eliminating waste.
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison to create flow.
Japanese word for “Non-value-added” or Ohno’s 7 Wastes.
Japanese word for “Unevenness” – fluctuation in demand that causes the workflow to be uneven.
Japanese word for “Overburdening” – excessive demand on a system that causes the system to produce beyond its reasonable capacity. Pushing a machine or person beyond natural limits. Overburdening people results in safety and quality problems. Overburdening equipment causes breakdowns and defects. N
Stands for Plan – Do – Check – Adjust. The cycle introduced by Walter A. Shewhart and popularized by Dr. W. E. Deming as a method of continuous improvement.
A disciplined management practice to be used throughout the project to assure that the facility meets the operational needs and values of the users, is delivered within the allowable budget, and promotes innovation throughout the process to increase value and eliminate waste (time, money, human effort.)
Encompasses the Target Value Delivery approaches implemented during the design delivery phases of the project.
Encompasses the Target Value Delivery approaches implemented during the construction delivery phases of the project.