PDCA (Plan, Do, Check, Act)
[…] Members When waste is identified in a design or construction process, the team should conduct the PDCA process to eliminate or minimize that waste and increase the value added to the project. The identification of waste in project processes often occurs through other Lean methods such as Value Stream Mapping, A3 Thinking, and Gemba Walks.