TDC-CH33-Go to the Work

[…] us understand the intricacies of how the work gets done in order to identify waste and improve performanc e. Going to the Work (called Going to the Gemba in original Toyota Production System language) is crucial to improving overall quality control and eliminating waste in the workflow process. 1.0 Why Going to the Work […]

LCI-Candidate-Handbook_05_02_2023

[…] Mindset of an Effective Big Room • Lean in the Design Phase (Pre-con) • Last Planner System® in Design Phase (Pre-con) • Target Value Delivery • Conducting Gemba Walks • Business Case for Lean Project Delivery • Kaizen • 5S in Construction • Ready, Set, Go Scrum! • Lean Deployment Guide Workshop • COAA/LCI […]

LCI-Candidate-Handbook_05_02_2023

[…] Mindset of an Effective Big Room • Lean in the Design Phase (Pre-con) • Last Planner System® in Design Phase (Pre-con) • Target Value Delivery • Conducting Gemba Walks • Business Case for Lean Project Delivery • Kaizen • 5S in Construction • Ready, Set, Go Scrum! • Lean Deployment Guide Workshop • COAA/LCI […]

LCJ_21_003

[…] & Leicht : Key Planning Steps Enabling Systematic Lean Implementa tion on Construction Projects Lean Construction Journal 20 21 http://creativecommons.org/licenses/by -nc-nd/ 4.0/ page 214 www.leanconstructionjournal.org ▪ performing Gemba walks (observational walkthroughs) to evaluate if Lean is being practiced on the project. On m any occasions, the resistance towards Lean comes from the leaders of […]

LCI Candidate Handbook_03_01_23

[…] Mindset of an Effective Big Room • Lean in the Design Phase (Pre-con) • Last Planner System® in Design Phase (Pre-con) • Target Value Delivery • Conducting Gemba Walks • Business Case for Lean Project Delivery • Kaizen • 5S in Construction • Ready, Set, Go Scrum! • Lean Deployment Guide Workshop • COAA/LCI […]

LCI Candidate Handbook_vJanuary 10 2023

[…] Mindset of an Effective Big Room • Lean in the Design Phase (Pre-con) • Last Planner System® in Design Phase (Pre-con) • Target Value Delivery • Conducting Gemba Walks • Business Case for Lean Project Delivery • Kaizen • 5S in Construction • Ready, Set, Go Scrum! • Lean Deployment Guide Workshop • COAA/LCI […]

LCJ 22-009

[…] process, they develop a responsibility for the qualit y of the process and its result. The “Best Foot theory” is inspired by the Japanese mindset found in Gemba and Kaizen , two well -known terms in Lean theory as they are vital principles in the Toyota Production System. Gemba is the actual place where […]

GEMBA Tour – Modular Power Solutions

  Speaker: Sandy Hankiewicz, Rosendin Electric, has 15 years of focused experience in electrical construction spanning Healthcare, Manufacture ring, and Data Centers. As a site Lead PM with Rosendin in TN she was named one of the Top 25 women in Mission Critical Technology in 2023. She brings a strategic approach to maintaining high-stakes assignments, […]

Project Walk: Sutter Medical Center – 42 Bed Expansion Gemba

    James Cahoon (R&S Construction) LEED AP, DBIA, is a Senior Project Manager with Rudolph and Sletten’s Roseville office. With over 26 years of experience, he has built a strong reputation in healthcare construction, delivering high-quality medical facilities on time and within budget. He played a key leadership role on the Sutter Medical Center […]